Purpose

This information sheet provides guidelines about the controls required for safely working in hothouses where gas combustion products are present.

Background

A gas installation that is part of a hothouse is deemed to be a complex gas installation under the Gas Safety Act 1997.

An application for acceptance of complex gas installations and Type B appliances must be submitted to Energy Safe Victoria through GasTrac prior to gas supply being approved.

CO2 dosing and exposure to combustion products

Raising the percentage of carbon dioxide (CO2) in a hothouse can accelerate plant growth. This is called CO2 dosing.

Hothouses are generally heated by in-ground hot water coils from a gas-fired water heater. Occasionally, direct-fired air heaters (where fanned air is directly heated by the burner flame) are used to raise both the hothouse’s temperature and CO2 levels, with the CO2 coming from the appliance’s combustion products.

Hothouses that use combustion products for CO2 dosing must be adequately ventilated. Without sufficient fresh air, the gas appliance will produce more carbon monoxide (CO), which can be extremely hazardous.

Further information on safe working levels for carbon monoxide is also available in Gas Information Sheet 44.

Guidelines

Acceptance requirements for CO2 dosing

There are different acceptance requirements which we oversee for CO2 dosing.

CO2 dosing using gas-fired water heaters

General acceptance requirements for the controlled release of combustion products into a hothouse using a gas-fired water heater (in-ground heating) are as follows:

  • A hazard/risk assessment must be undertaken and mitigations planned.
    • Assessments should include an adequate Job Safety Analysis (JSA), Safe Work Method Statements (SWMS) and/or equivalent proposed emergency procedures which include adequate means of personal access and egress from the hothouse, and emergency communications.
    • Consideration should be given to the type and quantity of CO and CO2 detectors to be used, their location, serviceable life and calibration requirements. Appropriate control systems are necessary to maintain a safe operating system.
  • The appliance is required to pre-purge to atmosphere (outside the hothouse) prior to start-up of the appliance burner. Dampers in the appliance or flue controlling this function must be:
    • interlocked
    • in the correct position before pre-purging begins.
  • The appliance’s main flame must be ‘proven’ (established and stable) before any combustion gases are allowed to enter the hothouse.
  • The CO level in the appliance flue must not exceed 400 ppm.
  • The environment within the hothouse must be continually monitored as part of the CO2 dosing system and the monitoring system must be interlocked to the appliance.
  • The appliance must shutdown or its combustion products be directed to atmosphere if the hothouse levels reach:
    • 10 ppm CO, or
    • 3000 ppm CO2.
  • Automated ventilation openings in the hothouse must:
    • be interlocked with the gas control system
    • open to introduce fresh air when high CO levels are detected in the hothouse.

CO2 dosing using direct-fired or mobile industrial heaters

Direct-fired heaters

General acceptance requirements for the controlled release of combustion products into a hothouse using a direct-fired appliance are as follows:

  • the air supply must be taken from outside the building as per AS 3814, clause 5.7.2.
  • the combustion product limits must comply with AS 3814, clause 5.7.7.1.
  • the maximum gas consumption per cubic metre of room volume in a hothouse must not exceed the limits listed in AS/NZS 5601.1, clause 6.10.6.3, Table 6.10.6.3.
Mobile industrial heaters

Mobile industrial heaters are designed for industrial heating applications, not for CO2 dosing. They are not recommended for use.

Mobile industrial heaters located indoors recirculate combustion products. They may create a hazardous environment without adequate ventilation.

Acceptance requirements based on appliance use

Considerations for appliance acceptance depend on how the appliance is being used.

An application for acceptance must be submitted via GasTrac for complex gas or Type B appliance installations. The application must be accepted by us before gas can be supplied to the installation.

CO2 dosing

Any appliance used in conjunction with a CO2 dosing system will be treated as a Type B appliance. As a result:

  • a Schedule 9 must be submitted and accepted by us before any work commences (an on-site inspection will subsequently be carried out by our team)
  • a CO monitoring system interlocked to shut down the appliance if the CO level in the hothouse exceeds 10 ppm or 3000 ppm CO2 is required
  • the CO monitoring system must be checked every three months and recalibrated as necessary by an appropriately qualified person
  • test records must be kept by the owner/operator
  • the appliance must be serviced in accordance with the manufacturer’s instructions (at least annually) and be kept in a safe condition and proper state of repair as per the requirements of Regulation 30 of the Gas Safety (Gas Installation) Regulations 2018.

Heating only (no CO2 dosing)

Where the appliance is only being used to produce heat then it must:

  • be certified as a Type A appliance or accepted by us as a Type B appliance
  • not exceed the maximum gas consumption limits in AS/NZS 5601.1, clause 6.10.6.3, Table 6.10.6.3
  • be serviced in accordance with the manufacturer’s instructions and in the case of a Type B appliance, be kept in a safe condition and proper state of repair as per the requirements of Regulation 30 of the Gas Safety (Gas Installation) Regulations
  • have its CO and CO2 readings checked by an appropriately qualified person to ensure they are within safe limits. After continuous operation of at least 2 hours, the atmosphere in the hothouse must be sampled and not exceed the following limits:
    • 10 ppm CO
    • 3000 ppm CO2.

If you’re a gasfitter new to GasTrac

GasTrac is our online gas installation acceptance system for managing gas applications. There are resources on the site to help with registration, updating your details and how to lodge a gas applications.

https://www.energysafe.vic.gov.au/log/digital-services-hub/gastrac-user-videos

Date: 31/10/2026 2:26

Controlled document

The currency and accuracy of this document cannot be guaranteed once printed or saved to a storage device. If in doubt, please check the ESV website for the current version.

Reviewed